What should be paid attention to in the installation of box-type substations
font size:SmallMiddleBig

The correct installation of the box-type transformer is the key to the correct use of the equipment in the subsequent process. Following the operation instructions can avoid vague failures due to improper installation during use, and reduce the frequency of downtime for maintenance.


1、The box transformer is mainly composed of natural wind and circulating cooling. Therefore, there should be no illegal stacking around it, especially the transformer room door should not be blocked, and the shutters should be regularly removed for ventilation and the attachments on the sub-holes to ensure that all electrical equipment does not exceed the allowable temperature.

2、The floor of the box-type substation should be placed in a higher place, not in a low-lying place, so as to avoid rainwater pouring into the box and affecting the operation of the equipment.

3、Zinc oxide arresters should be installed in the high-voltage distribution room of box-type transformers, and the installation method should be convenient for testing and disassembly and replacement.

4、The box door of the box-type substation should be opened outward, and there should be handles, secret doors and locks, and the secret doors and locks should be rust-proof

5、The noise level of the box-type substation shall not be greater than the specified noise level of the transformer. Regardless of whether the box shell is made of metal or non-metallic materials, the metal frame of the box body should be well grounded, with grounding terminals, and marked with a grounding symbol

6、

The transformer room should be dominated by natural ventilation, and the relationship between the temperature in the box and the output of the transformer should be given. The transformer room can be equipped with room temperature monitoring devices and self-starting ventilation and cooling devices as required to ensure that the transformer is under the specified environmental conditions.

run at full capacity. The transformer should be accessible from the top of the box or from the side doors.

7、The grounding and neutral line of the box-type substation share a grounding grid. The grounding grid is generally grounded at the four corners of the foundation, and then connected into one. The box-type substation and the grounding grid need to have two reliable connections. During the installation process of the box-type substation, attention should be paid to selecting the appropriate location and avoiding damage to the equipment caused by the external environment, which can prolong its service life, improve work efficiency, and bring better benefits to the enterprise.




Updated:2022-07-02 | Back to list
WeChat
WeChat
艳妇乳肉豪妇荡乳av无码福利| 欧美人与物videos另类| 久久精品国产亚洲av嫖农村妇女| 国产在线拍偷码自揄拍无| 亚洲熟妇无码av不卡在线播放| 无码人妻精品一区二区三区东京热| 看全色黄大色大片免费| 日本人妻丰满熟妇久久久久久| 成人精品一区二区三区中文字幕| 亚洲av不卡无码国产| 午夜护士黄色网站有哪些| 欧美老熟妇一区三区精品| 亚洲日韩精品无码av海量| 奇米网久久精品一区二区| 欧美 日韩 国内 自拍| 国产精品久久久久久婷婷| 国产在线拍揄自揄拍无码| 无码人妻精品一区二区三区不卡| 极品少妇一区二区三区四区| 亚洲日韩美女中文字幕乱| 精品国产乱码久久久久a| 亚洲一区二区三区在线电影| 久久精品中文字幕| 国产激情无码视频在线播放性色| 激情五月激情月婷婷六月 | 人妻借种太粗进不去| 免费观看完整视频app| 欧美人妻精品一区二区三区| 又大又紧又爽水又多18p| 国产精品国产自线拍免费| 久久精品午夜一区二区福利| 亚洲av无码片一区二区三区| 精品少妇ay一区二区三区| 97人人添人澡人人爽超碰| 少妇大叫太大太粗太爽了a片| 国产亚州精品女人久久久久久| 97欧美精品系列在线观看| 国产精品视频一二三四区| 精品一区二区三区在线视频| 丰满少妇特黄一区二区三区| 精品国产乱码久久久人妻|